Democratic Republic of the CongoRef. #32Etat·A · Ecosystems & coastal protection·
Kinshasa integrated program (erosion + wastewater)
200.0 M$indicative cost
Large ticket
Location
Country profileCountry
République Démocratique du Congo
CD · -4.0°, 21.7°

Expected impacts
- 1.Climat/environnement : Stabilisation ravins via solutions nature-based, séquestration carbone (végétalisation), réduction pollution eaux et restauration écosystèmes aquatiques. Adaptation urbaine : Résilience face pluies extrêmes/inondations par gestion intégrée eau/érosion, préservant services écosystémiques urbains. Impacts humains : Protection millions habitants, moins maladies hydriques, emplois verts (travaux publics, économie circulaire eau), inclusion femmes/jeunes. Contributions ODD : 6 (Eau/assainissement), 11 (Villes durables), 13 (Climat), 3 (Santé), 5 (Genre), 8 (Emploi). Restauration/infrastructures/gouvernance → écosystèmes restaurés, pollution réduite, Kinshasa résiliente et saine.
Impact themes
CarbonClimate adaptationFloods/ErosionHealthJobsSanitationSDGsWomenYouth
FRC Insight Corner
Public research dossier
Prepared by the FRC research team from publicly available information, multilateral databases, official government sources, and NGO reports.
Loading dossier…
Engagement scenarios
Play with the assumptions
Move the toggles to explore how different financing modes, private-sector participation and co-financing reshape the AfDB ticket and overall leverage.
Engagement mode
Public anchor + private co-invest
Private-sector share
40%
Co-financing (other donors)
30% of public
Project scale
100% of baseline
Disbursement horizon
7 yrs
Total mobilised
200.0 M$
AfDB ticket
84.0 M$
Private capital
80.0 M$
Co-financiers
36.0 M$
Annual AfDB outlay
12.0 M$
Leverage on AfDB $
2.38×
Public share
60%
Baseline cost
200.0 M$
Indicative · assumes a linear blend; actual structuring depends on due diligence.
Working notes
Analyst notes
Leave a signed comment on this project — observations, questions, intel. Visible to all visitors.
Loading notes…
Sources & methodology
What this page is built on
- 01F2BC — Programme prioritaire (CICOS / CEEAC)Official project pipeline brief shared by the Commission Internationale du Bassin Congo-Oubangui-Sangha.
- 02FRC analytical desk — internal compilationCross-checked against multilateral databases and national plans.
- 03FAO AQUASTAT, AfDB project portal, World Bank Projects DBBackground indicators and comparable project benchmarks.