CameroonRef. #10Etat·A · Ecosystems & coastal protection·Gestion des écosystèmes / Protection côtière
Integrated coastal and river erosion control program
17.5 M$indicative cost
Small ticket
Location
Country profileCountry
Cameroun
CM · 7.4°, 12.4°

Expected impacts
- 1.Stabilisation de 25 km de littoral et protection de 150 ha, 400 emplois verts créés, réduction de 30 % des pertes économiques annuelles
Impact themes
Floods/ErosionJobs
FRC Insight Corner
Public research dossier
Prepared by the FRC research team from publicly available information, multilateral databases, official government sources, and NGO reports.
Loading dossier…
Engagement scenarios
Play with the assumptions
Move the toggles to explore how different financing modes, private-sector participation and co-financing reshape the AfDB ticket and overall leverage.
Engagement mode
Public anchor + private co-invest
Private-sector share
40%
Co-financing (other donors)
30% of public
Project scale
100% of baseline
Disbursement horizon
7 yrs
Total mobilised
17.5 M$
AfDB ticket
7.35 M$
Private capital
7.00 M$
Co-financiers
3.15 M$
Annual AfDB outlay
1.05 M$
Leverage on AfDB $
2.38×
Public share
60%
Baseline cost
17.5 M$
Indicative · assumes a linear blend; actual structuring depends on due diligence.
Working notes
Analyst notes
Leave a signed comment on this project — observations, questions, intel. Visible to all visitors.
Loading notes…
Sources & methodology
What this page is built on
- 01F2BC — Programme prioritaire (CICOS / CEEAC)Official project pipeline brief shared by the Commission Internationale du Bassin Congo-Oubangui-Sangha.
- 02FRC analytical desk — internal compilationCross-checked against multilateral databases and national plans.
- 03FAO AQUASTAT, AfDB project portal, World Bank Projects DBBackground indicators and comparable project benchmarks.