CICOSRef. #51Institutionnel·C · Blue infrastructure, water & sanitation·Transport fluvial
Construction of 18 standardized river boats (whaleboats)
15.5 M$indicative cost
Small ticket
Location
Country profileGeography
CICOS
Regional body — multi-country scope
Expected impacts
- 1.Réduction de 30 % du nombre d'accidents de navigation fluviale sur les corridors ciblés
- 2.Augmentation de 25% du volume de marchandises transportées sur les axes concernés
- 3.Accroissement de 20% des revenus moyens des opérateurs fluviaux bénéficiaires
Impact themes
Sanitation
FRC Insight Corner
Public research dossier
Prepared by the FRC research team from publicly available information, multilateral databases, official government sources, and NGO reports.
Loading dossier…
Engagement scenarios
Play with the assumptions
Move the toggles to explore how different financing modes, private-sector participation and co-financing reshape the AfDB ticket and overall leverage.
Engagement mode
Public anchor + private co-invest
Private-sector share
40%
Co-financing (other donors)
30% of public
Project scale
100% of baseline
Disbursement horizon
7 yrs
Total mobilised
15.5 M$
AfDB ticket
6.51 M$
Private capital
6.20 M$
Co-financiers
2.79 M$
Annual AfDB outlay
0.93 M$
Leverage on AfDB $
2.38×
Public share
60%
Baseline cost
15.5 M$
Indicative · assumes a linear blend; actual structuring depends on due diligence.
Working notes
Analyst notes
Leave a signed comment on this project — observations, questions, intel. Visible to all visitors.
Loading notes…
Sources & methodology
What this page is built on
- 01F2BC — Programme prioritaire (CICOS / CEEAC)Official project pipeline brief shared by the Commission Internationale du Bassin Congo-Oubangui-Sangha.
- 02FRC analytical desk — internal compilationCross-checked against multilateral databases and national plans.
- 03FAO AQUASTAT, AfDB project portal, World Bank Projects DBBackground indicators and comparable project benchmarks.
Related projects
Angola
Simplified sanitation in co-owned properties
81.8 M$
Burundi
Strengthening the drinking water supply system in the northern area of Bujumbura city by capturing, treating, and distributing water from Lake Tanganyika
25.0 M$
Burundi
Strengthening drinking water supply systems in the cities of Gitega, Kirundo, Makamba, and Muramvya
80.1 M$