RwandaRef. #34Etat·C · Blue infrastructure, water & sanitation·Gestion durable de l'eau
Rehabilitation and integrated management of the Rusizi watershed
109.0 M$indicative cost
Large ticket
Location
Country profileCountry
Rwanda
RW · -1.9°, 29.9°

Expected impacts
- 1.Reforestation et réduction de l'érosion sur 400 000 ha de Bassin versant.
- 2.Réduction des inondations et amélioration de l'équilibre hydrologique.
- 3.Augmentation de la productivité agricole et des revenus ruraux;
- 4.Renforcement de la coopération transfrontalière avec le Burundi et la RDC.
- 5.Contribution aux ODD 6, 13, 15 et 17
Impact themes
Floods/ErosionForestsSanitationSDGsClean water
FRC Insight Corner
Public research dossier
Prepared by the FRC research team from publicly available information, multilateral databases, official government sources, and NGO reports.
Loading dossier…
Engagement scenarios
Play with the assumptions
Move the toggles to explore how different financing modes, private-sector participation and co-financing reshape the AfDB ticket and overall leverage.
Engagement mode
Public anchor + private co-invest
Private-sector share
40%
Co-financing (other donors)
30% of public
Project scale
100% of baseline
Disbursement horizon
7 yrs
Total mobilised
109.0 M$
AfDB ticket
45.8 M$
Private capital
43.6 M$
Co-financiers
19.6 M$
Annual AfDB outlay
6.54 M$
Leverage on AfDB $
2.38×
Public share
60%
Baseline cost
109.0 M$
Indicative · assumes a linear blend; actual structuring depends on due diligence.
Working notes
Analyst notes
Leave a signed comment on this project — observations, questions, intel. Visible to all visitors.
Loading notes…
Sources & methodology
What this page is built on
- 01F2BC — Programme prioritaire (CICOS / CEEAC)Official project pipeline brief shared by the Commission Internationale du Bassin Congo-Oubangui-Sangha.
- 02FRC analytical desk — internal compilationCross-checked against multilateral databases and national plans.
- 03FAO AQUASTAT, AfDB project portal, World Bank Projects DBBackground indicators and comparable project benchmarks.
Related projects
Angola
Simplified sanitation in co-owned properties
81.8 M$
Burundi
Strengthening the drinking water supply system in the northern area of Bujumbura city by capturing, treating, and distributing water from Lake Tanganyika
25.0 M$
Burundi
Strengthening drinking water supply systems in the cities of Gitega, Kirundo, Makamba, and Muramvya
80.1 M$